Perfox banks on Brokk

Premium Content

23 October 2017

Spanish demolition contractor Perfox is using six Brokk machines on a project to take down a structure in the capital Madrid’s financial district and break up more than 1,000 cu m (35,000 cu ft) of concrete in the process.

Brokk web

The Brokk 500 is “a small monster” according to Spanish demolition contractor Perfox

 

The demolition is part of the redevelopment of the city’s Cuatro Torres (Four Towers) complex, which contains some of Europe’s tallest skyscrapers. The construction of a fifth tower, called the Caleido, is scheduled to be finished in two years’ time.

The remote controlled machines comprise a Brokk 500, two 180s, two 160s and a Brokk 90. They are being used along with two large excavators because the building has a number of limited access spaces.

“We are very happy with Brokk,” said Perfox general director Ramiro Núñez.

“We have been working together for more than 12 years, we currently have eight Brokk machines, and we will be expanding our fleet soon.

“The Brokk 500 is a small monster, and it’s working in a place where we simply could not bring any other excavator.”

Latest News
Dewalt and Trackunit cooperate on tool location tracking
Contractors will be able to locate tools through the Bluetooth network of other connected machines
CRH and Heidelberg Materials acquire NCC operations
Industry division sold in transaction valued at SEK 8.2 billion (€733 million) subject to approval
Trawsfynydd takes next step towards reactor height reduction
NRS has formally handed over reactor buildings area to Costain
CONNECT WITH THE TEAM
Neel Madsen
Neel Madsen Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
Peter Collinson VP Sales Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA