Responsive Image Banner

Dusseldorf demolition

Premium Content

19 March 2008

Renovation work on an evangelist church on one of central Dusseldorf's main streets required the removal of a heavily reinforced 200 m2 concrete ceiling, but the presence of a car park under the building prevented the use of a heavy machine, as did a narrow entrance to the building. German contractor Wikie therefore selected one of the smallest machines in JCB's range of mini excavators, a JCB Micro weighing just over 1 tonne and only 0.7 m (2.3 ft) wide. The machine was fitted with a JCB Hammermaster HM60 to bring the ceiling down.

Latest News
Video: Iconic hotel demolished in Brazil
Charges were placed across 420 detonation points
AI-powered recycling system tested in France
Tomra system delivered to France-based recycling firm
Total Controlled Demolition begins dismantling at Airbus facility
“Technically challenging” project  is next to active runway
CONNECT WITH THE TEAM
Lewis Tyler Editor Tel: +44(0) 7566 799988 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Demolition & Recycling International and Construction Briefing Newsletter

Your Industry Brief: Construction, Demolition & Recycling

Stay ahead with the latest industry insights, project updates and expert analysis — straight to your inbox.

It’s free, relevant and quick to sign up.

Sign me up