demolition bits

By Lindsay Gale12 March 2008

• A new US$12.5 million (€ 8.7 million) landfill currently being developed by MCM Management Corp is expected to recycle 28% of all materials it receives once it starts operation, as well as being one of the first facilities of its type to use recycled materials in its construction, with as much as possible being used during the build process.

• Demolition of the famous Tiger Stadium in Detroit, US, now looks certain to go ahead. Contractors have been invited to bid for the project. Virtually all of the ball park will be torn down during the project. It is understood that a small section of the stadium will be kept and turned into a community centre. The demolition project is likely to start in early 2008.

• According to news reports, a judge in Madrid, Spain, has put a legal halt to the demolition of buildings in the Canada Real shantytown on the outskirts of the Spanish capital. Residents recently fought a pitched battle with Spanish police, which left 27 injured and nine under arrest. More than 40,000 live in the area, which is one of Europe's largest slum neighbourhoods with more than 2,000 illegally built structures.

• The famous New Frontier hotel and casino in Las Vegas has been successfully blown down by US-based Controlled Demolition. The demolition will make way for The Plaza, a development being described as the most extravagant complex ever built in Las Vegas. Considering some of the developments already constructed in Las Vagas, that is certainly saying something. Due to open in 2011, The Plaza will cost up to US$7 billion (€11 billion) to build.

The New Frontier, which has changed its name over the years, is famous as the first place that Elvis Presley performed in Las Vegas way back in 1956.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Demolition & Recycling International Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
World Demolition Summit 2021 - conference update
Latest speakers and presentations as industry returns to an in-person event at Chicago in October
Sales for Caterpillar’s construction segment up 40%
Cat sees strong growth in second quarter of 2021 reflecting ‘continued improvement’ in markets
Hear about 300-metre stack demolition at WDS 2021
World Demolition Summit conference programme to include US Widows Creek fossil plant project
CONNECT WITH THE TEAM
Steve Ducker Editor, Demolition & Recycling International Tel: +44(0) 1892 786 210 E-mail: steve.ducker@khl.com
Bridget Leary Sales Manager Tel: +44 (0) 1892 786 220 E-mail: bridget.leary@khl.com
CONNECT WITH SOCIAL MEDIA