Responsive Image Banner

Contractors secure places on US$250 million US Navy demolition framework

Premium Content

Eight specialist companies have secured places on a US$249 million demolition and remediation contract framework for the United States Navy.

The Independence-variant combat ship USS Santa Barbara at Port Hueneme, part of Naval Base Ventura County in California, USA. (PHOTO: US Navy/Ensign Drew Verbis) Most of the demolition, repair and renovation works will be carried out at US Navy sites in California. (PHOTO: The Independence-variant combat ship USS Santa Barbara at Port Hueneme, part of Naval Base Ventura County in California, USA. PHOTO CREDIT: US Navy/Ensign Drew Verbis)

Bhate Environmental Associates, BTS Equipment Unlimited, JKS Industries, Resource Environmental, Sea Pac Engineering, Speedway Orion JV, Stampede Ventures and Target Contractors - which recently won the prize for at the 2023 World Demolition Awards - have all been appointed to the multi-million-dollar deal, with the contracting authority being Naval Facilities Engineering Systems Command Southwest. 

The US Department of Defence said: “This contract predominantly involves building and structure demolition and site preparation to match the surrounding area including, but not limited, to paving and landscaping.

“Work will be performed at various government installations located in California (88%), Arizona (5%), Nevada (4%), Utah (1%), Colorado (1%), and New Mexico (1%), and is expected to be completed by December 2031.”

Works carried out under the framework will consist of indefinite-delivery/indefinite-quality contacts, each with a minimum value of US$5,000

Five other construction sector companies have also been appointed to fulfil design and build contracts as part of the framework. 

Dawson Enterprises, Heffler Contracting Group, Herman Construction Group, HHI Corp and R.A. Burch Construction will provide new construction, renovation, and repair works to the various US Navy installations. 

This latest news comes just weeks after the Naval Facilities Engineering Systems Command awarded a US$6 million contract to ECC Environmental for the removal and disposal of debris and selective demolition works at the site of an historic World War II airship hangar at the former Marine Corps Air Station (MCAS) Tustin, California.

30,000 bees removed from demolition site Honeybees threaten to delay US Army Corps of Engineers’ work on Treasury building
Latest News
Hitachi Construction Machinery to become Landcros
The company will officially rebrand in April 2027, with the OEM saying the new name signals its evolution beyond machinery
Interview: Inside a record-breaking blowdown
Brown & Mason project enters the history books
CONNECT WITH THE TEAM
Lewis Tyler Editor Tel: +44(0) 7566 799988 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Seats are nearly full for WDS

Experts from every continent come together at The World Demolition Summit to share how they’re solving the challenges you’ll face tomorrow. Learn from failures, near-misses, and creative recoveries that shaped some of the industry’s biggest projects.

📅 3-5 November 2025
📍 Nashville, TN
🎟️ Conference, Networking & Awards Dinner

Reserve one of the last seats