Responsive Image Banner

Containerdienst Adler tackles Eisenberg heating plant demolition

Containerdienst Adler is leading the demolition of the Eisenberg heating plant in Eisenberg, Central Germany, including the take down of a 60-metre-high chimney.

The Containerdienst Adler team onsite Containerdienst Adler GmbH (PHOTO: Epiroc)

Demolition of the site, which will become the a new service centre for the plant owner’s district office, involves dismantling the former heating plant, including a flat building section and the towering chimney.

Concrete rubble from the initial deconstruction is being repurposed to create a fall bed for the chimney, which will be brought down through a combination of crane dismantling and controlled blasting.

The contractor has deployed its new Epiroc’s HB 2000 hydraulic breaker, CC 3100 CombiCutter, BP 3050 R bulk pulverizer, and MG 1800 R multi-grapple for the project.

Managing Director Thomas Adler explained that the selection of these attachments followed a consultation with Epiroc’s Area Sales Manager, Ralf Schumann, and Nagel Baumaschinen’s Sales Manager, Robin Hallbauer.

Epiroc’s on-site support during the handover ensured the equipment was optimally adjusted for the job, with operators trained in safe handling and maintenance. Adler emphasised the importance of this technical support in maintaining efficiency and reliability during the challenging project.

The chimney demolition will mark a significant step in the site’s redevelopment, showcasing the contractor’s capability in managing complex and high-profile demolition tasks.

Latest News
Volvo CE and Metzner in first all-electric deconstruction project
Volvo Construction Equipment (Volvo CE) and Metzner Recycling has completed the world’s first zero-emission industrial-scale deconstruction
Metso inaugurates hydrogen-powered plant
Pre-reduction pilot plant uses hydrogen as the sole reducing agent
Steelwrist launches “next-generation” tiltrotator control system
Sweden-based OEM Steelwrist has unveiled QuantumConnect, its new tiltrotator control system platform
CONNECT WITH THE TEAM
Lewis Tyler Editor Tel: +44(0) 7566 799988 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

If You’re Not Here, You’re Catching Up.

Experts from every continent come together at the The World Demolition Summit to share how they’re solving the challenges you’ll face tomorrow. Learn from failures, near-misses, and creative recoveries that shaped some of the industry’s biggest projects.

📅 3-5 November 2025
📍 Nashville, TN
🎟️ Conference, Networking & Awards Dinner

Count me in!