Responsive Image Banner

Tower crane demolition

Premium Content

21 October 2019

The attempted demolition of the two damaged Liebherr tower cranes, part of the Morrow fleet, at the Hard Rock Hotel site took place on Sunday 20 October. According to the City of New Orleans’ Mayor’s Office this was to “mitigate further damage” as the tower cranes were in danger of collapsing.

The Mayor’s Office stated, “the two cranes remaining on the construction site will be brought down in a controlled fashion. Expert engineers have developed a plan to conduct a controlled collapse of the cranes that will bring them down in place.”

However, many comments made across various media channels running video footage of the demolition question exactly how controlled the collapse was, with much of the structure of one tower crane remaining on the roof. Take a look at the video and judge for yourself.

 

 

CONNECT WITH THE TEAM
Lewis Tyler Editor Tel: +44(0) 7566 799988 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Demolition & Recycling International and Construction Briefing Newsletter

Your Industry Brief: Construction, Demolition & Recycling

Stay ahead with the latest industry insights, project updates and expert analysis — straight to your inbox.

It’s free, relevant and quick to sign up.

Sign me up