Redcar steelworks furnace demolished

By Leila Steed24 November 2022

Demolition specialist Thompsons of Prudhoe has brought down the 111 m (365 ft) tall blast furnace at the SSI Redcar steelworks in the north of England

The Redcar Blast Furnace The Redcar Blast Furnace. (Photo: Teesworks)

The Redcar blast furnace - which was built in 1979 and was once said to be the second largest of its kind in Europe - had been in operation for nearly a century but closed in 2015 after the site’s owner Sahaviriya Steel Industries UK entered liquidation.

It was demolished yesterday (Wednesday 23 November, 2022) via a controlled explosion that incorporated the furnace’s associated casting houses, charge conveyors and dust catcher. 

The blow down is the latest of a number of major demolition works to be carried out at the site, which is being redeveloped to form part of a 1,821 ha (4,500 acre) manufacturing hub.

While the site’s Sinter Plant was taken down in August, last month saw Thompsons use 1.6 t of explosives to carry out the demolition of the Basic Oxygen Steelmaking (BOS) plant (part of SSI Redcar steelworks).

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Demolition & Recycling International Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
Global construction equipment sales for 2022 revealed
Off-Highway Research reveals sales of global construction equipment in 2022 and looks ahead to potential sales in 2023 
Latest research: Equipment sales in Europe set to remain high
Analyst Off-Highway Research reports near-record numbers of units sold in 2022
Kobelco aims for big performance from new small machines
OEM introduces next generation to its range of mini excavators
CONNECT WITH THE TEAM
Steve Ducker Editor, Demolition & Recycling International Tel: +44(0) 1892 786 210 E-mail: steve.ducker@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA