Piacenza-Lodi Bridge demolition
Premium Content
09 November 2010
Despe had just 90 days to remove the upper structures of the Piacenza-Lodi Bridge over the River Po in Italy
CONNECT WITH THE TEAM

Leila Steed
Editor, Demolition & Recycling International
Tel: +44(0) 1892 786 261
E-mail: [email protected]
