Responsive Image Banner

Piacenza-Lodi Bridge demolition

Premium Content

09 November 2010

Despe had just 90 days to remove the upper structures of the Piacenza-Lodi Bridge over the River Po in Italy
CONNECT WITH THE TEAM
Leila Steed Editor, Demolition & Recycling International Tel: +44(0) 1892 786 261 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA