Moss Abbruch Pilzhochstrasse demolition, Ludwigshafen

22 July 2021

The German contractor Moss Abbruch takes down a bridge in the city of Ludwigshafen in Rhineland-Palatinate in the south west of the country.

The bridge was 540 m (1,771 ft) long and had a solid mass of around 11,000 cubic metres (388,000 cu ft).

To read more about Moss Abbruch and other leading global demolition contractors, check out the d&ri100 listing in the July-August issue of Demolition & Recycling International.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Demolition & Recycling International Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
CONNECT WITH THE TEAM
Leila Steed Editor, Demolition & Recycling International Tel: +44(0) 1892 786 261 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
Simon Kelly Group Sales Manager Tel: +44 (0) 1892 786 223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA