Moss Abbruch Pilzhochstrasse demolition, Ludwigshafen

By Steve Ducker22 July 2021

The German contractor Moss Abbruch takes down a bridge in the city of Ludwigshafen in Rhineland-Palatinate in the south west of the country.

The bridge was 540 m (1,771 ft) long and had a solid mass of around 11,000 cubic metres (388,000 cu ft).

To read more about Moss Abbruch and other leading global demolition contractors, check out the d&ri100 listing in the July-August issue of Demolition & Recycling International.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Demolition & Recycling International Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
Electric and hydrogen ‘milestones’ for JCB
OEM announces new fully electric wheeled loader, while hydrogen engine development continues
Australia to build ‘flagship’ C&D waste recycling plant
Rino Recycling to operate new AUS$89 million Brisbane facility
Could you become a Certified Demolition Supervisor?
NDA says demolition professionals can still apply for CDS examination
CONNECT WITH THE TEAM
Steve Ducker Editor, Demolition & Recycling International Tel: +44(0) 1892 786 210 E-mail: steve.ducker@khl.com
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: simon.kelly@khl.com
CONNECT WITH SOCIAL MEDIA