Moss Abbruch Pilzhochstrasse demolition, Ludwigshafen

By Steve Ducker22 July 2021

The German contractor Moss Abbruch takes down a bridge in the city of Ludwigshafen in Rhineland-Palatinate in the south west of the country.

The bridge was 540 m (1,771 ft) long and had a solid mass of around 11,000 cubic metres (388,000 cu ft).

To read more about Moss Abbruch and other leading global demolition contractors, check out the d&ri100 listing in the July-August issue of Demolition & Recycling International.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Demolition & Recycling International Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
The evolution of demolition
Big changes in the past 30 years mean demolishers can be trusted with full control of a project
Caterpillar launches three Next Gen loaders
Stage V Cat 906, 907 and 908 compact models fitted with new C2.8 engine
Plantworx exhibition returns
Dates confirmed for 2023 construction equipment event in the UK
CONNECT WITH THE TEAM
Steve Ducker Editor, Demolition & Recycling International Tel: +44(0) 1892 786 210 E-mail: steve.ducker@khl.com
Bridget Leary Sales Manager Tel: +44 (0) 1892 786 220 E-mail: bridget.leary@khl.com
CONNECT WITH SOCIAL MEDIA