All champlain bridge Articles

Delsan-AIM’s Simon Hébert to deliver keynote at World Demolition Summit 2025
2024 Best of the Best World Demolition Award-winner to take to the stage in Nashville
Delsan-AIM crowned ‘Best of the Best’ at the World Demolition Awards
Simon Hébert, Civil Works Manager: “I never thought we’d get both awards”
Champlain Bridge Demolition: Extremely loading modelling and simulation technology
Premium Content
Experts from Delsan-AIM and ASI reveals how they simulated the collapse of a 3.4-km bridge
Engineering marvels: One bridge, four demolition methods
Premium Content
How Delsan-AIM dismantled Montreal’s 3.5-km-long Champlain Bridge
World Demolition Awards Shortlist: Civils
Premium Content
An overview of the nominees for best Civils Demolition project