Controlled deconstruction at height

Hear first-hand from the team behind the complex removal of a 43-metre-high water tank in Ontario, Canada, at the World Demolition Summit 2026.

Camille and Rachelle Atrache of Canada’s Tri-Phase Group will present a case study on the demolition of the Snelgrove elevated water tank.

Located in a former hamlet on the northern edge of Brampton, near Toronto, this complex, high-risk infrastructure removal required specialised planning, engineered methodology and strict safety execution.

The…

Log in to continue reading

Log in for free access to this article and more, including:

  • Industry news and expert insight
  • Digital magazines and reports
  • Newsletters covering the topics that matter to you
  • If you haven’t completed your free registration yet, we’ll ask you for a few details before returning you to the article.

    CONNECT WITH THE TEAM
    Neel Madsen
    Neel Madsen Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
    Peter Collinson VP Sales Tel: +44 (0) 1892 786220 E-mail: [email protected]
    CONNECT WITH SOCIAL MEDIA