Thornton Tomasetti’s role at One James River Plaza

By Leila Steed13 January 2021

See footage from the May 2020 implosion of One James River Plaza in Richmond, Virginia, alongside Thornton Tomasetti’s computer simulation predicting the progression of the collapse. The controlled demolition of the 21-storey urban office tower was validated by high-fidelity engineering analyses.

Thornton Tomasetti’s structural engineers also developed plans for the mechanical demolition of the below-grade parking garage and determined the structural stability of the building prior to the implosion, while its geo-structural experts focused on the installation of a new earth retention system to maintain the stability of the surrounding area.

For more information on the project, read the full article from the November-December 2020 issue of Demolition & Recycling International.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Demolition & Recycling International Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
CONNECT WITH THE TEAM
Steve Ducker Editor, Demolition & Recycling International Tel: +44(0) 1892 786 210 E-mail: steve.ducker@khl.com
Bridget Leary Sales Manager Tel: +44 (0) 1892 786 220 E-mail: bridget.leary@khl.com
CONNECT WITH SOCIAL MEDIA
Latest News
O’Keefe wins place on national framework
UK demolition company joins public demolition framework worth US$108 million
Review of 2020 - October
Part 10 of D&Ri’s look back at the past 12 months in demolition and recycling
Edge Innovate launches wheel-mounted screener
SM186 designed for difficult and demanding applications including demolition waste