UK-based engineering and construction contractor Keltbray Group has announced that Karl Goose will step down from his role as Chief Executive Officer by mutual agreement with the Board.

The new Silvertown Tunnel opened on 7 April 2025, boosting cross-river public transport options in east London The new Silvertown Tunnel opened on 7 April 2025, boosting cross-river public transport options in east London. Image: TFL

In a press release the company said that, “Following a constructive period of transition and strategic review, both Keltbray and Karl have agreed that the role and organisation were ultimately not the right long-term fit.”

The company added that, while there was strong alignment around the company’s ambitions, the day-to-day scope and expectations of the role evolved differently from those originally envisaged by both parties.

Brendan Kerr, Executive Chair and Shareholder of Keltbray Group, said, “Following open and positive discussions, we jointly concluded that the role and broader organisational environment were not ultimately the right fit for the longer term.

“This in no way reflects on Karl’s capability or leadership qualities, and we are grateful for the contribution he has made during his time with the business. We wish him every success in the future.”

Goose joined as CEO in December 2025 from Ferrovial where he was Managing Director.

“Following open and constructive conversations with the Board, we have mutually agreed that this is the right time for the company and for me to move in different directions. I leave with great respect for the organisation and the people within it, and I wish the business every success as it continues to develop and expand into new markets,” said Goose. 

Keltbray is a leading UK specialist engineering, demolition, and construction contractor. Recent projects for the contractor include Silvertown Tunnel, HS2 Curzon Street Station in Birmingham and the Shard. 

Latest News
Steinert details demolition waste recovery at German recycling plant
Optical sorting technology helps Otto Dörner recover high-quality aggregates from construction and demolition waste
Eastern Demolition enters liquidation
Notice in The Gazette confirms creditors’ voluntary liquidation and the appointment of a liquidator
Tackling the toughest concrete on Germany’s biggest power station demolition with the Demarec DCC-110-D XTR
Extremely thick concrete and a mass of steel reinforcement required an innovative solution from PORR-Becker and Demarec
CONNECT WITH THE TEAM
Neel Madsen
Neel Madsen Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
Peter Collinson VP Sales Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA