Responsive Image Banner

Keeping dust down on site with no strings attached

Premium Content

21 July 2011

AR Demolition is using a Dustfighter DF7500MPT dust suppression unit on a site in Leicester, UK, to minimise dust impact on air quality levels in the immediate neighbourhood of the site. Supplied by ACE Plant through UK distributor TowerLight UK, the Dustfighter is manufactured by Milan, Italy, based DF Ecology. It provides a powerful water spread from an entirely self-contained unit that needs no mains power or water connections to operate. Operating power comes from an on board silenced generator and the unit is fitted onto a towable trailer for transport.

According to AR Demolition's Richard Dolman: "The Dustfighter is a versatile, compact and a very user friendly unit, particularly when using the remote control. The Dustfighter is almost effortless to operate and fits in well with our forward thinking approach to demolition, protection of the public, our staff and the environment."

Latest News
Epiroc among three companies to join Open-S initiative
Genesis Attachments and Kanamoto also join
DOE starts demolition of former uranium process site
Project could take up to five years, DOE says
Video: Iconic hotel demolished in Brazil
Charges were placed across 420 detonation points
CONNECT WITH THE TEAM
Lewis Tyler Editor Tel: +44(0) 7566 799988 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA
Demolition & Recycling International and Construction Briefing Newsletter

Your Industry Brief: Construction, Demolition & Recycling

Stay ahead with the latest industry insights, project updates and expert analysis — straight to your inbox.

It’s free, relevant and quick to sign up.

Sign me up