Fabio Bruno deploys ultra high reach excavator for large-scale project in Brazil

Fábio Bruno Construções has deployed Brazil’s first 150-tonne Caterpillar 395 Ultra High Reach excavator on a two-year project in Maceió, Alagoas, tackling over 800,000 square metres of demolition amid logistical challenges, safety measures, and waste management practices.

Log in to continue reading

Log in for free access to this article and more, including:

  • Industry news and expert insight
  • Digital magazines and reports
  • Newsletters covering the topics that matter to you
  • If you haven’t completed your free registration yet, we’ll ask you for a few details before returning you to the article.

    CONNECT WITH THE TEAM
    Neel Madsen
    Neel Madsen Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
    Peter Collinson VP Sales Tel: +44 (0) 1892 786220 E-mail: [email protected]
    CONNECT WITH SOCIAL MEDIA