Calder Hall update

Premium Content

10 April 2008

D&Ri apologises unreservably for the incorrect attribution for the Calder Hall blowdown to UK contractor Controlled Group in the report published in the November- December issue.

Personnel from US explosive specialist Controlled Demolition Inc, out of Phoenix, Maryland, in fact carried out the explosive side of the demolition at the Sellafield site.

I wish to extend my apologies to CDI president Mark Loizeaux and the rest of his team.

Latest News
Steinert details demolition waste recovery at German recycling plant
Optical sorting technology helps Otto Dörner recover high-quality aggregates from construction and demolition waste
Eastern Demolition enters liquidation
Notice in The Gazette confirms creditors’ voluntary liquidation and the appointment of a liquidator
Tackling the toughest concrete on Germany’s biggest power station demolition with the Demarec DCC-110-D XTR
Extremely thick concrete and a mass of steel reinforcement required an innovative solution from PORR-Becker and Demarec
CONNECT WITH THE TEAM
Neel Madsen
Neel Madsen Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
Peter Collinson VP Sales Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA