Breaking under water

Premium Content

06 October 2010

A Promove XP4500 breaker was used to remodel the port of Poltu Quatu on the Italian island of Sardin

A Promove XP4500 breaker was used to remodel the port of Poltu Quatu on the Italian island of Sardinia to make mooring room for 239 10-35 m (33-115 ft) yachts

Contractor P.Aul. Immobiliare, based in Olbia, northeast Sardinia, is a specialist in marine works, earthmoving and demolition, and was engaged to restyle the port of Poltu Quatu on the island. The work involved the demolition of 40 concrete blocks, each weighing 56 tonnes (carried out using explosives) where the former moorings were located. Demolition of underwater granite was also required to deepen the harbour and position new pillars for the new marina structure.

A Promove XP4500, mounted on a Fiat-Kobelco EX455 positioned on a pontoon, performed the latter job as well as the underwater demolition of a concrete structure measuring 40 x 4 m (130 x 13 ft) at a depth of 3.5 m (11.5 ft). All the material was processed by another Promove demolition attachment (a CP1510 multi-processing crusher installed on a CAT 319D), recycled and reused on site.

Latest News
Husqvarna introduces two new demolition robot models
DXR 705 and DXR 715 compact robots are designed for demanding demolition and industrial applications
The changing face of demolition
Newly appointed president of the IDE speaks to D&Ri about his vision for the future of demolition
Reclinker secures £10m to scale demolition concrete recycling
Oversubscribed funding round to help expand commercial production of low-carbon cement 
CONNECT WITH THE TEAM
Neel Madsen
Neel Madsen Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
Peter Collinson VP Sales Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA