Australian recycling efforts halted by asbestos concerns

Premium Content

25 May 2012

According to news reports, plans to use over a million tonnes of construction and demolition debris in Western Australia have been halted by concerns that have been raised about possible asbestos contamination of the waste and the potential health and safety issues that could arise as a result.

The original agreement between Main Roads WA and the Western Australia Waste Authority has been halted by the state's Department of Transport pending a review that will be carried out by the Department of Environment and the Department of Health.

Around 80,000 tonnes of such waste has already been used on road schemes in the state and tests have confirmed that no asbestos materials were included in this.

Main Roads WA has reverted to using virgin materials in the road projects ongoing across the state, such as the Great Eastern Highway upgrade.

Latest News
Steinert details demolition waste recovery at German recycling plant
Optical sorting technology helps Otto Dörner recover high-quality aggregates from construction and demolition waste
Eastern Demolition enters liquidation
Notice in The Gazette confirms creditors’ voluntary liquidation and the appointment of a liquidator
Tackling the toughest concrete on Germany’s biggest power station demolition with the Demarec DCC-110-D XTR
Extremely thick concrete and a mass of steel reinforcement required an innovative solution from PORR-Becker and Demarec
CONNECT WITH THE TEAM
Neel Madsen
Neel Madsen Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
Peter Collinson VP Sales Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA