Responsive Image Banner

Energy sector decommissioning: EDF’s 15-year power plant demolition strategy

Premium Content

Pierre Migny-Torres, EDF Project Director, and Alexandre Druet, EDF Site Director and Deconstruction Technical Advisor, give insight into the 15-year decommissioning strategy being carried out by French energy giant EDF. The company, which has its own in-house planning department devoted to the projects, has carried out the dismantling of ten of its power plant facilities in recent years, and has a further nine plants scheduled for decommissioning.

In their presentation at this year’s World Demolition Summit, Pierre and Alexandre detail how the company works with contractors and the challenges involved in carrying out the demolition projects, from a client’s perspective.

Why Detroit is demolishing 16,000 structures LaJuan Counts discusses the city’s US&0.5 billion plan to dismantle and stabilise over 16,000 blighted structures
CONNECT WITH THE TEAM
Lewis Tyler Editor Tel: +44(0) 7566 799988 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Have you registered yet?

The World Demolition Summit
is the global gathering for the demolition industry – bringing together contractors, engineers, OEMs, and experts to share best practices, celebrate success, and shape the future of demolition.

📅 3-5 November 2025
📍 Nashville, TN
🎟️ Conference, Networking & Awards Dinner

Register Now